Table 2: Costs of Scoping Scenarios
Scenarios (10 year totals) |
Adoption Rate |
Penetration vs. Baseline |
Cost vs. Baseline |
Baseline: * Existing historic buying patterns continue * Config #1 (19”H max., 28”W, 17”D) * Transfer supports and leg supports are not included |
Baseline: 30% |
Baseline: 43% |
Baseline: $1.91B |
Scenario A: * Accessible equipment required to be purchased when facility construction occurs (new or remodel) * Config #2 (19”H max., 28”W, 17”D) * Existing tables upgraded to accessible (config #2) |
20%
100% |
-17%
17% |
-$0.41B
$1.36B |
Scenario B: * Accessible equipment required to be purchased when facility construction occurs (new or remodel) * Config #3 (17”H max., 28”W, 17”D) * Existing tables not able to be upgraded to be accessible |
20%
100% |
-35%
-1% |
-$0.53
$1.53B |