11B-228.3 Electric vehicle charging stations.

11B-228.3.1 General.

Where electric vehicle charging stations (EVCS) are provided, EVCS shall be provided in accordance with Section 11B-228.3.

11B-228.3.1.1 Existing facilities.

Where new EVCS are added to a facility with existing EVCS, the requirements of Section 11B-812 shall apply only to the new EVCS installed. Alterations to existing EVCS shall comply with Section 11B-228.3.

11B-228.3.1.2 Operable parts.

Where EV chargers are provided, operable parts on all EV chargers shall comply with Section 11B-309.4 _|Operation|_.

11B-228.3.2 Minimum number.

EVCS complying with Section 11B-812 shall be provided in accordance with Section 11B-228.3.2. Where EVCS are provided in more than one facility on a site, the number of EVCS complying with Section 11B-228.3.2 provided on the site shall be calculated according to the number required for each facility. Where an EV charger can simultaneously charge more than one vehicle, the number of EV chargers provided shall be considered equivalent to the number of electric vehicles that can be simultaneously charged.

Exceptions:

1.      EVCS not available to the general public and intended for use by a designated vehicle or driver shall not be required to comply with Section 11B-228.3.2. Examples include, but are not limited to, EVCS serving public or private fleet vehicles and EVCS assigned to an employee.

2.      In public housing facilities, EVCS intended for use by an EV owner or operator at their residence shall not be required to comply with Section 11B-228.3.2.

11B-228.3.2.1 Public use or common use EVCS.

Where EVCS are provided for public use or common use, EVCS complying with Section 11B-812 shall be provided in accordance with Table 11B-228.3.2.1. Where new EVCS are installed in facilities with existing EVCS, the “Total Number of EVCS at a Facility” in Table 11B-228.3.2.1 shall include both existing and new EVCS.

Exception: All drive-up EVCS shall comply with Section 11B-812.

TABLE 11B-228.3.2.1 ELECTRIC VEHICLE CHARGING STATIONS FOR PUBLIC USE AND COMMON USE

TOTAL NUMBER OF EVCS AT A FACILITY1   MINIMUM NUMBER (by type) OF EVCS REQUIRED TO COMPLY WITH SECTION 11B-8121  
  Van
Accessible
Standard
Accessible
Ambulatory
1 to 4 1 0 0
5 to 25 1 1 0
26 to 50 1 1 1
51 to 75 1 2 2
76 to 100 1 3 3
101 and over 1, plus 1 for each 300, or fraction thereof, over 100 3, plus 1 for each 60, or fraction thereof, over 100 3, plus 1 for each 50, or fraction thereof, over 100

1      Where an EV charger can simultaneously charge more than one vehicle, the number of EVCS provided shall be considered equivalent to the number of electric vehicles that can be simultaneously charged.

ETA Editor's Note

The ADA requirements included at Section 11B-228 are provided for information only. The CBC scoping requirements are more inclusive.  The electric vehicle charging station scoping requirements are new to CBC, as of 2016, complemented by new definitions in Section 202 and technical requirements in Section 11B-812.  DSA-AC has not yet issued any advisories pertaining to them.  EVCS are not addressed by 2010 ADAS, although a case could be made, based on the general obligation for governments to make their services, programs or activities available to individuals with disabilities [ADA Title II, §35.130], and for public accommodations and commercial facilities to make their goods, services, facilities, etc. available [ADA Title III, §36.201(a)], that, if EVCS are made available to the public by any of these enties, they must be made available to individuals with disabilities.  However, the absence of scoping or technical requirements in the Standards would make it difficult to conclude what that means.