2.4 Best practices for stating the result of noncompliance
2.4.1 Based on the methods for measuring compliance, define what remedial actions are acceptable when construction elements exceed tolerances. These may include total replacement, partial replacement, adjustment, moving, filling, patching, or other operations as appropriate for the construction element.
2.4.2 When defining acceptable methods of correction for a non - complying element, give reasonable consideration to how the remedial action may affect construction time, cost, adjacent construction, and appearance. If possible, give the contractor options for how the element may be brought into compliance.