Final Regulatory Assessment and Final Regulatory Flexibility Analysis Final Rule - Nondiscrimination on the Basis of Disability by Public Accommodations - Movie Theaters; Movie Captioning and Audio Description
8.1. Annual Costs
ETA Editor's Note
The tables below are available in a wider format in the document's original location here: https://www.ada.gov/regs2016/final_ra_movie_captioning.html#_Toc450814664.
Table 8-1 : Annual Costs Over Period of Analysis in Primary Analysis, Discounted at 7 Percent ($ millions)
Primary Analysis |
Total Costs |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
2022 |
2023 |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
Captioning Hardware Acquisition Costs |
$14.6 |
$3.3 |
$6.2 |
$0.5 |
$0.5 |
$0.5 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.3 |
$0.3 |
$0.3 |
$0.3 |
Audio Hardware Acquisition Costs |
$0.5 |
$0.1 |
$0.3 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
Captioning Device Acquisition Costs |
$15.7 |
$4.5 |
$8.4 |
$0.3 |
$0.3 |
$0.3 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
Audio Device Acquisition Costs |
$2.4 |
$0.7 |
$1.3 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
Installation Costs |
$1.0 |
$0.3 |
$0.5 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
Replacement Cost |
$36.1 |
$1.0 |
$2.9 |
$2.8 |
$2.6 |
$2.5 |
$2.4 |
$2.2 |
$2.1 |
$2.0 |
$2.2 |
$3.4 |
$4.1 |
$2.3 |
$1.8 |
$1.8 |
Training Costs |
$9.9 |
$1.0 |
$0.9 |
$0.8 |
$0.8 |
$0.8 |
$0.7 |
$0.7 |
$0.6 |
$0.6 |
$0.6 |
$0.5 |
$0.5 |
$0.5 |
$0.5 |
$0.4 |
O&M Costs |
$8.2 |
$0.3 |
$0.7 |
$0.7 |
$0.7 |
$0.6 |
$0.6 |
$0.6 |
$0.6 |
$0.5 |
$0.5 |
$0.5 |
$0.5 |
$0.5 |
$0.5 |
$0.4 |
Total Costs |
$88.5 |
$11.2 |
$21.2 |
$5.2 |
$4.9 |
$4.7 |
$4.4 |
$4.2 |
$4.0 |
$3.8 |
$3.9 |
$5.1 |
$5.7 |
$3.8 |
$3.3 |
$3.1 |
Table 8-2 : Annual Costs Over Period of Analysis in Low Accessibility Baseline, Discounted at 7 Percent ($ millions)
Low Accessibility Baseline |
Total |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
2022 |
2023 |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
Captioning Hardware Acquisition Costs |
$18.5 |
$4.7 |
$8.7 |
$0.5 |
$0.5 |
$0.5 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.3 |
$0.3 |
$0.3 |
$0.3 |
$0.5 |
$0.2 |
$0.3 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
|
Captioning Device Acquisition Costs |
$16.8 |
$4.9 |
$9.1 |
$0.3 |
$0.3 |
$0.3 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
Audio Device Acquisition Costs |
$2.6 |
$0.8 |
$1.4 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
Installation Costs |
$1.2 |
$0.3 |
$0.6 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
Replacement Costs |
$40.3 |
$1.1 |
$3.2 |
$3.0 |
$2.8 |
$2.7 |
$2.5 |
$2.4 |
$2.3 |
$2.2 |
$2.4 |
$4.2 |
$5.1 |
$2.6 |
$1.9 |
$1.8 |
Training Costs |
$9.9 |
$1.0 |
$0.9 |
$0.8 |
$0.8 |
$0.8 |
$0.7 |
$0.7 |
$0.6 |
$0.6 |
$0.6 |
$0.5 |
$0.5 |
$0.5 |
$0.5 |
$0.4 |
O&M Costs |
$9.6 |
$0.3 |
$0.9 |
$0.8 |
$0.8 |
$0.8 |
$0.7 |
$0.7 |
$0.7 |
$0.6 |
$0.6 |
$0.6 |
$0.6 |
$0.5 |
$0.5 |
$0.5 |
Total Costs |
$99.5 |
$13.2 |
$25.1 |
$5.6 |
$5.3 |
$5.0 |
$4.7 |
$4.5 |
$4.3 |
$4.1 |
$4.2 |
$5.9 |
$6.8 |
$4.2 |
$3.4 |
$3.3 |
Table 8-3 : Annual Costs Over Period of Analysis in High Accessibility Baseline, Discounted at 7 Percent ($ millions)
High Accessibility Baseline |
Total |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
2022 |
2023 |
2024 |
2025 |
2026 |
2027 |
2028 |
2029 |
2030 |
Captioning Hardware Acquisition Costs |
$7.7 |
$0.9 |
$1.7 |
$0.5 |
$0.5 |
$0.5 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.3 |
$0.3 |
$0.3 |
$0.3 |
Audio Hardware Acquisition Costs |
$0.3 |
$0.1 |
$0.2 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
Captioning Device Acquisition Costs |
$13.6 |
$3.8 |
$7.1 |
$0.3 |
$0.3 |
$0.3 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
$0.2 |
Audio Device Acquisition Costs |
$2.1 |
$0.6 |
$1.1 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
Installation Costs |
$0.7 |
$0.2 |
$0.3 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
$0.0 |
Replacement Costs |
$28.7 |
$0.9 |
$2.5 |
$2.3 |
$2.2 |
$2.1 |
$2.0 |
$1.9 |
$1.9 |
$1.8 |
$1.8 |
$2.0 |
$2.2 |
$1.8 |
$1.7 |
$1.6 |
Training Costs |
$9.9 |
$1.0 |
$0.9 |
$0.8 |
$0.8 |
$0.8 |
$0.7 |
$0.7 |
$0.6 |
$0.6 |
$0.6 |
$0.5 |
$0.5 |
$0.5 |
$0.5 |
$0.4 |
O&M Costs |
$5.6 |
$0.2 |
$0.5 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.4 |
$0.3 |
$0.3 |
Total Costs |
$68.8 |
$7.5 |
$14.1 |
$4.5 |
$4.3 |
$4.1 |
$3.9 |
$3.7 |
$3.6 |
$3.4 |
$3.3 |
$3.5 |
$3.6 |
$3.2 |
$3.0 |
$2.9 |
User Comments/Questions
Add Comment/Question