Hello. Please sign in!

DSA IR 11B-10: SCOPING AND PATH OF TRAVEL UPGRADE REQUIREMENTS FOR FACILITY ALTERATION, ADDITION AND STRUCTURAL REPAIR PROJECTS (with revisions issued through April 2017)

1.2 Compliance with New Construction Requirements: The basic work of any project, whether new construction, an addition to an existing building or facility or an alteration of an existing building or facility, must comply with the following requirements for new construction:

  • "11B-201.1 Scope. All areas of newly designed and newly constructed buildings and facilities and altered portions of existing buildings and facilities shall comply with these requirements."1

1 "These requirements" means the accessibility provisions of Chapter 11B and related sections within the California Building Code, current edition.

  • "11B-202.3 Alterations. Where existing elements or spaces are altered, each altered element or space shall comply with the applicable requirements of Division 2, including Section 11B-202.4."

[MORE INFO...]

*You must sign in to view [MORE INFO...]