Hello. Please sign in!

DSA IR 11B-10: SCOPING AND PATH OF TRAVEL UPGRADE REQUIREMENTS FOR FACILITY ALTERATION, ADDITION AND STRUCTURAL REPAIR PROJECTS (with revisions issued through April 2017)

BACKGROUND: A project at an existing site is an alteration of that facility and subject to the requirements of CBC Section 11B-202.4: Path of travel requirements in alterations, additions and structural repairs. This applies to 1) alteration or structural repair of an existing building or feature on the site or 2) addition of a new building or new elements to an existing building, facility or site.

[MORE INFO...]

*You must sign in to view [MORE INFO...]