DSA PR 15-01: REQUIRED INFORMATION FOR PATH OF TRAVEL UPGRADES ON CONSTRUCTION DOCUMENTS (with revisions issued through April 2017)

3. FIELD VERIFICATION: DSA may review the code compliance of the path of travel during the course of a project.

3.1 Plan Review: DSA may verify compliance of path of travel elements presented on the construction documents as part of the plan review process. Discrepancies between the construction documents and actual field conditions will be resolved as part of the plan review and back check process.

3.2 During Construction: Path of travel items within the scope of the project represented as code compliant but found to be nonconforming beyond reasonable construction tolerances shall be brought into compliance with the CBC as a part of the project. A construction change document to correct the discrepancy shall be prepared by the design professional in responsible charge.

3.3 At Completion: Any required path of travel upgrades not complete at the end of the project will be identified as Deficiency Items and indicated as such in the DSA Certification Box until corrected.