Looking at Cal Green 5.106.5.3, we must provide the conduits and panel capacity for future installation for the required number of spaces (2 in this case). However, it is only when the equipment is to be installed that we need to refer to CBC and CEC. Section 11B-228.3.1 also reiterates this. Therefore, we would show the location of the conduit stub outs adjacent to 2 current parking spaces and would show space on the electric panel for the future equipment – and that is all. At this time, we do not need to show the requirements for EV accessibility when equipment is installed per Chapter 11B. Is my interpretation correct?
RESPONSE: CBC Chapter 11B accessibility provisions for EVCS apply when a project consists of one or more electric vehicle charging spaces served by an electric vehicle charger or other charging equipment. Where the project does not provide charging equipment the code does not require the provision of accessible routes or other vehicle space accessibility requirements. However, it is good practice to notify the owner or owner’s representative of any additional code requirements that will be triggered by the later installation of charging equipment. The owner can use this information to determine the sequence and extent of work to be included in each phase of the project.
All work is required to comply with the applicable codes and standards. Plans and specifications must accurately describe the full extent of the work to be performed. Some enforcement jurisdictions (primarily city- and county building departments) may have additional requirements.
User Comments/Questions
Add Comment/Question