Changes in Level [§303]
Changes in level can be up to ¼” without treatment or ½” if beveled with a slope no steeper than 1:2. Changes in level above a ½” must be treated as a ramp or curb ramp (or a walkway if a slope no steeper than 1:20 can be achieved). These specifications apply to all portions of accessible routes, including thresholds and carpet trim.
1/4” Max Change in Level
1/2” Max Change in Level
User Comments/Questions
Add Comment/Question