2. New Construction and Alterations
80. Federal regulations promulgated to enforce the ADA require that each new facility or part of a facility constructed or altered after January 26, 1992, conform to either (1) the ADAAG (i.e., ADA Accessibility Guidelines for Buildings and Facilities) or (2) the UFAS, thereby allowing public entities to choose between the two accessibility standards. See 28 C.F.R. § 35.151.
81. The City has elected to use ADAAG as its standard for ensuring that newly constructed or altered facilities comply with federal access laws. RT 1919:20-24.
82. Since June 22, 1998, the City has required that all projects involving new construction or alterations of a building funded, in whole or in part, by the City, undergo review by City staff to ensure compliance with disability access laws. RT 1568:11-1569:24; 1914:17-1917:5; 1918:12-22; 1919:6-19; DTX P11; DTX A35 [000126-141]. To that end, City staff members regularly meet with architectural teams during the planning and design stage, review construction plans before permits are issued, visit sites during the construction process, and conduct post-construction field inspections to ensure access compliance. RT 1744:19-1748:15, 1901:15-1903:22, 1914:17-1917:5, 1918:12-22, 1919:6-19, 1568:11-1569:24; DTX P11; DTX A35 [000126-141].
83. The City also requires that sidewalks and curb ramps adjacent to newly constructed or altered City buildings be accessible to persons with disabilities. As a result, whenever a City facility is constructed or altered, the City evaluates the condition of the sidewalk and curb ramps bounding the perimeter of the project site, evaluates the path of travel from the facility to the public right-of-way, nearby parking and public transportation, and corrects any access problems identified. RT 1936:4-1938:11.
84. In January 2010, DPW adopted and implemented Procedure 9.8.24, which is a written accessibility compliance procedure that sets forth the review process for all projects designed by or contracted through DPW to ensure that all construction plans and completed facilities meet applicable access regulations and City standards. RT 1920:24-1921:24; DTX A14.
85. Procedure 9.8.24 requires DPW Disability Access Coordinator to conduct: (1) accessibility reviews during the planning and design of DPW-managed City projects, which includes the review of construction drawings and plans prior to submission to the Department of Building Inspection; (2) accessibility reviews during construction; and (3) post-construction inspections for disability access compliance before the building is certified for occupancy. DTX A14; RT 1921:25-1935:19; DTX J21; DTX K10. Publicly-funded projects reviewed by MOD undergo similar access reviews. RT 1742:23-1743:6, 1743:16-1748:15, 1901:15-1904:8. The Department of Building Inspection will not issue a building permit, or certify a project as complete, without written approval from MOD's compliance officers for each stage of design and construction. RT 1747:1-1748:15, 1901:15-1904:8.
86. Hecker opined that the City staff members responsible for design and construction review of publicly-funded projects are "well qualified, competent, detail-oriented professionals that really understand the accessibility requirements of the ADA." RT 2729:17-2730:3. The Court finds Hecker, who serves as a consultant to the DOJ in ADA enforcement actions, to be a credible witness and credits his testimony accordingly. RT 2720:6-2721:15.