SECTION#3
For the following questions, please answer every item pertaining to the trail pre-installation specifications. Leave blank if the response choice is not applicable to you. Some questions require you to fill in the blank with a corresponding answer.
20. Please indicate the trail’s soil composition/type, and the depth at which it can be found (choose all that apply):
Soil composition/ type | Depth
0”- 4” |
Depth
5”- 8” |
Depth
>8” |
Depth
“Unknown” |
Cemented soil
(particles are held together by a chemical agent, such as calcium carbonate) |
||||
Cohesive soil
(examples of cohesive soils are: clay, silty clay, sandy clay, clay loam and, in some cases, silty clay loam and sandy clay loam) |
||||
Dry soil
(does not exhibit visible signs of moisture content) |
||||
Fissured soil
(has a tendency to break along definite planes of fracture with little resistance, or a material that exhibits open cracks) |
||||
Granular soil
(gravel, sand, or silt with little or no clay content) |
||||
Moist soil
(soil looks and feels damp) |
||||
Plastic soil
(allows the soil to be deformed or molded without cracking) |
||||
Saturated soil (voids are filled with water) | ||||
Unknown |
Other (please specify):
21. Please indicate the typical slope the particular trail has prior to trail installation:
Up to 5%
Between 5% (1:20) and 8.33% (1:12)
Between 8.33% (1:12) and 10% (1:10)
Between 10% (1:10) and 12.5% (1:8)
Greater than 12.5% (1:8)
User Comments/Questions
Add Comment/Question