Hello. Please sign in!

National Trail Surfaces Study

29. Please indicate what the length of time was between the installation of the trail surface material and the first necessary repair:

  1 month 3 months 6 months 1 year 2 years
Time between installation to first repair          

Other (please specify):

[MORE INFO...]

*You must sign in to view [MORE INFO...]