Site topography requires removal of barrier by adding an elevator, does this trigger POT upgrades to the area of work?
Adding an elevator for barrier removal trigger POT upgrades?
General Comment or Question
Re: 2010 ADA Standards for Accessible Design Pocket Guide / CHAPTER 4: ACCESSIBLE ROUTES
James V. Vitale, AIA, LEED AP, CASp 007 | November 04, 2015 at 10:11AM (edited)
Related Keywords
Related Section Numbers
- 2010 ADA Standards for Accessible Design Pocket Guide (1)
- 2012 Florida Accessibility Code for Building Construction Pocket Guide (1)
- 2013 California Standards for Accessible Design Pocket Guide (1)
- Guidance on the 2010 ADA Standards for Accessible Design (1)
- Guide to the ADA Standards (1)
- ABA Accessibility Standard for GSA Facilities Pocket Guide (1)
Accurate: N/A (0 votes)
Helpful: N/A (0 votes)
Message 1 of 2
Re: Adding an elevator for barrier removal trigger POT upgrades?
General Comment or Question
Re: 2010 ADA Standards for Accessible Design Pocket Guide / CHAPTER 4: ACCESSIBLE ROUTES
James L. Terry | August 10, 2020 at 12:08PM (edited)
Readily achievable barrier removal does not trigger additional path of travel work under the ADA. State and local standards and interpretations may vary.
Related Keywords
Related Section Numbers
- 2010 ADA Standards for Accessible Design Pocket Guide (8)
- 2019 California Standards for Accessible Design Guide (effective January 1, 2020 with July 1, 2021 amendments) (1)
- 2012 Florida Accessibility Code for Building Construction Pocket Guide (1)
- 2012 Texas Accessibility Standards (TAS) Pocket Guide (1)
- 2016 California Standards for Accessible Design Pocket Guide - Eff. Jan. 1, 2017 (1)
- 2013 California Standards for Accessible Design Pocket Guide (1)
- Guidance on the 2010 ADA Standards for Accessible Design (1)
- Guide to the ADA Standards (2)
- ABA Accessibility Standard for GSA Facilities Pocket Guide (1)
Accurate: N/A (0 votes)
Helpful: N/A (0 votes)
Message 2 of 2