Hello. Please sign in!

CALBO Accessibility Construction Inspection Checklist

ROUGH GRADE SITE INSPECTION

Locate and verify the plan specified accessible routes from existing public sidewalks, accessible parking locations, and other site arrival points to building entrances and exits.

11B-206.1

Identify the plan specified accessible routes from all entrances and exits to common and public use areas on the site.

11B-206.2.2

If site conditions have swamp type lands, steep grades, drainage ditches, flood hazards or other inconsistencies with the approved plans, proper methods of compliance shall be reviewed and approved by the building official/plan checker prior to continuing.

 

Verify that drainage, drainage swales, catch basins and grates do not violate  slope or surface requirements along accessible routes, accessible parking and access aisles, etc.

11B-403

Verify if under-slab plumbing will provide adequate clearances from finished walls.

11B-604.2

Site Lighting shall be capable of providing a minimum of one foot candle to the surface.

1006

[MORE INFO...]

*You must sign in to view [MORE INFO...]